Sunday, December 4, 2016

Latest Habbiinsings

I mentioned in an earlier episode on these Habbiins wagons that a silly Transwaggon decal might be added to the side of one at some stage. 

I've owned an ALPS decal printer for about 20 years that I have a love-hate relationship with.  It's expensive to run, temperamental (making it even more expensive to run) and only runs on Windows XP. I do have an XP computer lying around but don't really feel like finding it, unpacking it, plugging it in and seeing if it still talks to the ALPS at the moment. 

And while the ALPS is great for lettering and printing out the simple 'vector' images that I've drawn up using CorelDraw, Adobe Illustrator, and similar programs, it really struggles with 'raster' bitmapped images from the likes of Photoshop, or images that you might borrow from the interweb. Mainly because its ancient drivers struggle to mix colours and produce an output that isn't all dotty and lo-res like a video game from the 1980s.

The solution is to use a laser printer for these raster images because they'll readily print at 300 or 600 dpi - plenty of resolution for a model. I don't happen to own one, but my local library and local print shop do. While I did find a colour .svg vector image for this logo online, spending 20 cents on a copy is better than an afternoon swearing at the ALPS, so off I went armed with my images in a word processing document, a sheet of plain clear decal paper (purchased from MicroMark in the US about 5 years ago) and a ruler. 

After a bit of iterative fiddling to get sizes correct, PDF-ing, transporting via a USB stick and so on, out it came. And on it went. I measured 23mm, and it printed out at 23mm, but it should be a tad bigger. I suppose I didn't take the ribs into account. And it should be a bit lower down the wagon side. But hey, close enough and proof that ye olde decal paper hasn't crumbled into dust.


Friday, December 2, 2016

Getting the runaround

There's not much to see in the below video clip that you haven't seen before, although for once: proof that a complete loop of the layout by fully traversing the uphill and downhill mains is possible.




There is one short 30cm section of the 'inner' uphill siding that still requires track, but all sections are wired up except for the strange siding at the back of the yard that you must back into. It's all provided for on the control panel, but needs 10 minutes and some wire to hook up.

Thursday, November 24, 2016

In Control

Time to tame the electrical demons.

The back of a control panel. Starting to drill some holes for block isolation switches:

These are DPDT center-off switches which will route power to a block (for example, the "Up Main"). The theory is that with the switch in the up position, power will be routed to the track from the "UP" controller, if down, from the "DOWN" controllers, and, as the name suggests, no connections are made when the switch is in the center position.

If I wasn't so impatient I would have something clever done with that front panel but can't wait now...

The input power buses starting to be connected with copper telephone wire:

Input plug from the two controllers connected to the busses behind:

Connected to the track sections tag board:

And tacked into place on the layout:



A few more wires to attach ...


Tuesday, November 22, 2016

Gettin it together

Five strips of Peco Z flex track arrived in the post a few days ago. They've sat neglected in the corner of the trainroom since, while periodic rituals involving pondering were performed.

I know I should complete the wiring and build a control panel, but today I accidentally glued a section of foamboard trackbed in place, so figured I might as well go to town while the ball was rolling. This is why I scored 55% in School Certificate English.

An hour or so later I'd managed to lay the double mainline up to the 'summit' and connect up one of the passing loops at its hidden station. The apex of the third level of track is where the uphill mainline loops around to become the down main while also providing (minimal) storage so that an uphill train which has just summitted doesn't have to immediately go back downhill again.

looking 'south' towards a non-existent Goschenen which would be a few miles beyond my summit sidings

Looking 'north' from the summit storage sidings and Wattinger

There's still plenty of feed-wiring and track soldering to be done before a train can finally loop around continuously up and down, round and round, ad-nauseam under its own power, and I do need to see if I can eek out the storage siding trackage at the summit from the few remaining centimetres of track and few fishplates I have left, but it does seem like a milestone has been reached

Half of the untested summit trackage foolishly glued in place

Monday, November 14, 2016

Organising a Rat's Nest - wiring tagboards

As someone who has been using DCC since 1995, it seems strange to be 'stepping back in time' to a DC powered layout.

As Wassen is a whimsical distraction that I've already spent more than enough money on, adding a bunch of Z decoders and fluffing about with all of that isn't likely to happen at this stage, if at all. Especially as this seems to be a pretty simple layout with just an 'Up' track and a 'Down' track and some storage sidings.

However to make that work involves electrically isolating the track into sections and powering only the ones that you want to actually run trains on at a particular point in time.

By my count (and I did run out of fingers at one stage), there will be 9 or 10 sections on the layout: two mainline tracks, 5 sidings or isolatable sections in the yard at the bottom, and two or three up top.

As you "saw" earlier (if you'll pardon the pun), I used a Dremel cut off wheel to cut gaps in the rails. (If I'd had some plastic insulating rail joiners I might have used those, but they don't always hold the track in perfect alignment.)

Until now, I have soldered the minimum number of wires onto tracks and hung them all together in a temporary fashion to be able to run a train around for testing purposes. Obviously that's only a partial short-term solution that had to be tackled at some stage.

Today I decided to make this all a bit more kosher, wiring up all (ok, 'all but one') of the sidings:

...feeding all the wires properly through the baseboard (easy in foamboard!),



...and attaching them all to a tagboard so its a bit easier to understand and debug as required:

I've put the tagboard into a spot to the right-rear of the layout that is reasonably accessible, labeled it with a marker that you probably can't see here, and used different coloured wires where possible to make troubleshooting and adjustments easier.

Thursday, November 10, 2016

Over the Top

Since it's armistice day (Nov 11), it seems appropriate to steel myself to go over the top and embark on a final big push to the summit.

Lacking the necessary bits of track right now, I'm having to make do with foamboard to see what the path across no mans land looks like. Hopefully that will be resolved shortly and the rails will be able to take their first vertical steps in some months.

Tentative steps. Looking 'north'

From behind. Mug (NZMRG Porirua 1994!) for scale for the benefit of Am-Fet



Monday, November 7, 2016

How small is Z anyway?

While N scale certainly has a better selection of rolling stock, when I first hit on the idea of "Wassen on a door", for obvious reasons, Z was the only scale that was considered.

Why? Because it's small. Small-enough-to-fit-a-lot-of-track-on-a-door small.

Well it's supposed to be small. But when the first of my Z purchases was unboxed, they weren't as tiny as had been expected. The locos certainly don't get lost on your workbench, the track is workable, and as we've seen recently, you can even 'model' in Z.

So to respond to a recent question/comment/request - how small is it really?

Here's a side-by-side comparison that can be readily set up with models on hand - a Z scale Swiss Re 4/4 (1:220) vs an N scale North American Dash 9 (1:160) vs a New Zealand DC in NZ120 (TT 1:120).


Crikey. After having only played with Z this year and not seeing an N scale engine out in the wild for some time, Z suddenly seemed a lot smaller than I realised. Or probably more accurately, N seemed a lot bigger.

In comparing apples with motorcycles, it's fair to point out that a real General Electric Dash 9 is a lot wider, taller and longer than the other two locomotives, but empirically, it would seem that Z is indeed smaller than the others by quite a margin.

But its not tiny. That would be T gauge.