I'll be traveling and thus away from my Z scale Mini-Me Wassen for most of July, but here's the latest progress.
The first semi-permanent steps have been made down into the hidden yard and a temporary test section - which will be the third level traveling over the upper Meienreuss bridge and then past The Command Post - can be seen at the end of this vid.
Even though this train is a little slow out of the yard as I fiddle with controller and phone-camera without enough fingers and eyes, this 2:20 video somewhat surprisingly shows how much running time there is on a layout only 180cm long.
No comments:
Post a Comment