I intended to make the Wassen Shell service station today.
After making a start on the yellow canopy, some time was spent pondering about how big the building should be, and where it should all be located on the layout.
To do that it made sense to see where the road goes.
To do that I might as well put down the road.
To do that I needed to put the sidewalk and buildings down.
So the (incorrect for Wassen) cobblestone sidewalks went in, almost all the buildings on the far side of the road (except the Alte Poste) were glued down, a little scenery was added behind the gaps, and the road went down. A drill bit is holding down the schoolhouse in a near-vertical position.
The Shell station canopy is the triangley bit. With the roads and basics in place, I can start adding soem more buildings. Starting with the Shell, and probably the obvious pink building in between it and the existing buildings.
As an aside, I see the Alte Poste hotel shut down in 2019 and was for sale. It seems silly, but I expect that a lot of their trade was railfans, so they can probably blame the BasisTunnel for there now being too many rooms in Wassen.
No comments:
Post a Comment